Customization: | Available |
---|---|
Specifications: | USB BM |
Shape: | Circular |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Packaging Details: |
500pcs/CTN Packing with pllatic boxs |
---|---|
Delivery Detail: | 15-20days |
Three Hole Rear Panel×1 |
2 Ports USB Socket×1 |
USB Cover×1 |
Cigarette Socket×1 |
Cigarette Cover ×1 |
Cigarette Lighter×1 |
Herit Socket×1 |
Herit Cover ×1 |
Standard Nut×2 |
Specifications | |
Model | YM1196 |
Size | 49mm*26mm |
Input | 12/24V DC |
Output | 5V 2.1A, 3.1A, 4.2A |
Material | Nylon (housing),PVC (cap) |
Certification | ROHS,CE, FCC |
Warrantys | 12 Months |
Our Advantages
From the purchase of raw materials to the finished product, all production process (product development/plating/mold and equipment processing/ metalpressing/ plasticinjection/semi-automatic and fully automated equipment assembly, etc.) are completed in the factory. Our metal pressing and plastic injection own the advantages of 100% self-made mold, from a single form to the various forms of application. And we continuously keep innovation and enhance the technology in order to collaborate with our customers to design the most sophisticated products. Yujie Electronics Co., Ltd., whether in production base or in quality assurance department in the head office, have professional equipment and technical personnel. In addition to the annual new product development, product improvement and testing are performed as annual plan to ensure that listed products maintain in best quality. Therefore, our long-term customers/partners, get the best quality of the switches.
FAQ |
Q1: What is the material of your products? |
A: The material is ABS/PC/Bakelite/Nylon. |
Q2: How can I get some samples? |
A: We are honored to offer you samples. |
Q3: When can I get the samples? |
A: It depends on the express, generally 3-10 days. |
Q4: Can you accept small order? |
A: Yes, we will try our best to help you with your business. |
Q5: What's the lead time of mass production? |
A: Generally 2-4weeks. We will inform you the delivery time after receiving your payment. |
Q6:How does your factory do regarding quality control? |
AQuality is priority. |